UPS & critical power

We install and maintain uninterruptible power systems of every size. Independent of any one manufacturer, we match the right system to your load and keep it running.

How a UPS protects a critical load Mains power flows through the UPS to the critical load. When the mains fails, the battery takes over instantly so the load never loses power. When the mains returns, the battery recharges. MAINS FAILURE UPS AC/DC DC/AC BATTERY CRITICAL LOAD ZERO BREAK
  • Mains Healthy
  • Battery Standby
  • Load Protected

Qualified for UPS work

UPS and battery systems need specialist training, not just a general electrical ticket. These UPS-specific qualifications are held within our team, with our UPS work led by Managing Director Mark Fowler.

  1. Switching and Safe Isolation of UPS Systems

    Safe switching, isolation and bypass procedures on live UPS installations.

    City & Guilds Assured

  2. Standby Battery System Installation

    Installing UPS and standby battery strings, cabinets and racks.

    EAL

  3. Operational Health and Safety Awareness for Standby Battery Systems

    Working safely around standby battery systems: hazards, handling and controls.

    EAL

Alongside NICEIC Approved Contractor status, ECS cards and SparkSafe Licence to Practice.

EAL certificate: Standby Battery System Installation
City & Guilds Assured certificate: Switching and Safe Isolation of UPS Systems
EAL certificate: Operational Health and Safety Awareness for Standby Battery Systems

Any size, any brand

Because we are not tied to any UPS manufacturer, we are free to recommend the system that suits your site. We install and maintain systems from all the major brands, at any scale.

  • Comms rooms and server cabinets

    Rack-mounted and single-phase units protecting network kit, phone systems and small server rooms.

  • Commercial buildings

    Three-phase standalone systems for offices, schools, labs and critical floor areas.

  • Data centres and hospitals

    Large and modular systems, including parallel and redundant configurations for loads that can never drop.

What we install and look after

UPS installation and commissioning support
Positioning, cabling and connection of new systems, working with the manufacturer's engineers through commissioning.
Battery systems and replacements
Battery strings, cabinets and racks installed or replaced, with safe disposal of old cells.
Maintenance bypass panels
External bypass arrangements so the UPS can be serviced or replaced without dropping the load.
Generator interface and ATS changeover
Changeover switching and controls so the UPS, mains and standby generator work together.
LV supplies and distribution
Incoming supplies, sub-mains, distribution boards and final circuits feeding and fed by the UPS.
Replacements and upgrades
Swapping out end-of-life systems on live sites, planned around your operation.

How a UPS install runs

  1. Survey

    We look at the load, the space, the supply and how the site operates day to day.

  2. Specify

    We size the system, the batteries and the bypass arrangement, working alongside the chosen manufacturer.

  3. Plan the shutdown

    Method statements, isolation plans and timings agreed so the live operation is protected.

  4. Install and commission

    Our electricians install and connect, then support the manufacturer through commissioning.

  5. Maintain

    A maintenance contract keeps the system tested and ready, year after year.

Engineer testing UPS battery strings with a battery tester

Maintenance contracts

A UPS only protects you if it works on the day the mains fails. Our maintenance contracts cover the electrical side of your system so problems are found on a planned visit, not during an outage.

  • Planned maintenance visits
  • Battery testing and replacement
  • Bypass and changeover checks
  • Thermal and connection checks
  • Coordination with manufacturer servicing
  • Clear reports after every visit

UPS questions

Which UPS brands do you work with?

All the major manufacturers. We are independent rather than tied to one brand, so the recommendation is based on your site.

Can you install a UPS without shutting the site down?

Most of the work can be done with the site live. Where a shutdown is needed for the final connection, we plan it with you, usually out of hours, and keep it as short as possible.

Do you take on maintenance for a UPS someone else installed?

Yes. We will survey the existing system and set up a maintenance contract that suits it.

Planning a UPS install?

Tell us about the site, the system or the people you need. We will come back to you within one working day.